The vessel - specially designed for Stun & Bleed operations
The first vessel is planned to be delivered in 2020. The capacities is optimised for purpose and operational needs are taken into the consideration in all aspects of the vessel.
Special features of the vessel:
- 2 complete Stun & Bleed lines for high capacity and redundancy
- 2 RSW system with large cooling capacity and to have redundancy
- Automatic cleaning of RSW tanks and pipes.
Pre-rigor time
The pre-rigor phase will normally be over 30 hours. This is achieved due to that the fish is stunned and bled within seconds after harvest from the pen. The fish will experience the minimum stress possible.